This reference PM list is kept for historical continuity. To create next week's draft, use a NEW eMaint work-order CSV on the Next-week draft tab. The draft will use only that file—not every saved PM definition.
Erase this week's schedule removes every PM, corrective, and project work order currently assigned this week and puts the PMs back in the unbuilt list, so you can fix run days and build again. It does not touch the loaded list, techs, or roster.
Pick a Sunday to schedule any week, including future weeks.
Check the days production runs. Running PMs are assigned on checked days; non-running PMs are assigned on unchecked days. Review the roster before building a schedule.
Who is on shift is set on the Roster tab. Here you set how many PMs each tech gets per day.
PM data now saves with everything else in Uptime Command and is included in the main backup. Import your old PM Scheduler export once to bring over your schedule and records.
Import separate running and non-running eMaint CSV files each week. Each replaces only its own category; generating a draft uses the combined unique work-order list. This does not replace saved PM definitions or edit this week's assignments. Duplicate WO numbers are listed separately and are not automatically assigned twice.
Changing a technician or day in the draft does not touch the active schedule. Orange warnings identify assignments on a technician's off-shift day or an incompatible production day; you can still override them intentionally.
Preview only. Choose the absent technician and date. The scheduler proposes available replacements, preferring the same day, compatible production days and a balanced workload. Completed and not-complete work remains untouched. Nothing changes until your approval.
The suggestions check shift availability and counts of scheduled open work. They do not verify technician qualifications, estimated labor hours or equipment access. Review those before approving. A call-off is recorded as an off-shift roster override only upon approval.
Wyatt is assigned to 1st shift, four on / four off beginning November 19, 2026, opposite Sean. You can override any working day by clicking its calendar cell. Imported calendar data does not change existing PM work-order assignments.
Turn on a repeating pattern for any tech. For example, 4 days on and 4 days off, starting from the first day of a working block. Dates before the start use the calendar. Manual changes in the calendar below always win.
Click a day to switch that tech on or off. Filled cell = working. Amber outline = manual change. Blue text = from a pattern. Plain = from the calendar.
Preview only. Choose the absent technician and date. The scheduler proposes available replacements, preferring the same day, compatible production days and a balanced workload. Completed and not-complete work remains untouched. Nothing changes until your approval.
The suggestions check shift availability and counts of scheduled open work. They do not verify technician qualifications, estimated labor hours or equipment access. Review those before approving. A call-off is recorded as an off-shift roster override only upon approval.
Corrective work orders are separate from PM completion. The PM record also has a checkbox to confirm whether a corrective was entered in eMaint.
Move reassigns open work. Reschedule on a not-complete PM adds a new copy on another tech or day, and the original stays on record as a miss. Details records everything about a work order.
Full week displays Sunday through Saturday of the selected date. Single day shows just that date. Use Complete or Not complete for quick entry, or Details for issues and notes.
Choose which dashboard sections appear. These preferences are stored in your browser backup. Shared multi-user settings require a database connection; GitHub Pages alone does not synchronize changes.
Grouped by technician, shift, day, week, or month. On-time % = completed by original scheduled day / original PM assignments. Eventual % = originally assigned PMs completed later or on time / original PM assignments. Open PMs remain in the denominator. Later completions of the same PM count only once. Legacy reschedules without explicit links are matched only when unambiguous.
Click a name to open that tech's PM records.
Layout matches the Sunday PM sheet: summary on top, then one section per technician with Seq, WO, Asset / ID, PM / Task, and Source date. In the print dialog, choose "Save as PDF" to keep a copy.